Automatic Meter Reading (AMR)
Automated Meter Reading (AMR) relates to the use of a device which communicates resource consumption information (normally energy, gas or water) measured by a meter to a supplier. It is normally one directional, in that the meter communicates only for example with an energy supplier, say once a month reporting the amount of energy being used.
These devices avoid manual reading which can be time-consuming, unreliable or difficult to achieve, if for example water meters are located in difficult to access areas, or occupants are unavailable to give access. AMRs can normally be installed alongside existing meters, rather than requiring a new meter entirely, communicating measurements, potentially without an Internet connection.
Advanced Meter Integration (AMI) describes a smarter system that relies on a newer smarter meters to replace existing ones. These communicate data in real-time to whatever specification is required. This is the precursor to what we commonly now call the smart meter, which can be a two way device, most commonly used to measure, assess and track commercial or residential energy use. Some AMRs today however have similar functionalities as smart meters.
The AMR was first patented in 1974 by T.Paraskevakos who developed radio based fire, security and medical alarm systems for Boeing before the internet enabled wi-fi accessible devices. The first commercially available system was launched in 1977 by Metretek.
AMR's, AMI and smart meters are often key components in Measurement and Verification (M&V) of resource (especially energy) consumption for individual buildings or facilities and in the implementation, testing and assessment of Energy Conservation Measures (ECMs) of those facilities.
[edit] Related articles on Designing Buildings
Featured articles and news
Homes, landlords. tenants and the new housing standards
What will it all mean?
The Architectural Technology podcast: Where it's AT
Catch-up on the latest episodes.
Edmundson Apprentice of the Year award 2026
Entries now open for this Electrical Contractors' Association award.
Traditional blue-grey slate from one of the oldest and largest UK slate quarries down in Cornwall.
There are plenty of sources with the potential to be redeveloped.
Change of use legislation breaths new life into buildings
A run down on Class MA of the General Permitted Development Order.
Solar generation in the historic environment
Success requires understanding each site in detail.
Level 6 Design, Construction and Management BSc
CIOB launches first-ever degree programme to develop the next generation of construction leaders.
Open for business as of April, with its 2026 prospectus and new pipeline of housing schemes.
The operational value of workforce health
Keeping projects moving. Incorporating unplanned absence and the importance of health, in operations.
A carbon case for indigenous slate
UK slate can offer clear embodied carbon advantages.
Costs and insolvencies mount for SMEs, despite growth
Construction sector under insolvency and wage bill pressure in part linked to National Insurance, says report.
The place for vitrified clay pipes in modern infrastructure
Why vitrified clay pipes are reclaiming their role in built projects.
Research by construction PR consultancy LMC published.
Roles and responsibilities of domestic clients
ACA Safety in Construction guide for domestic clients.
Fire door compliance in UK commercial buildings
Architect and manufacturer gives their low down.






















Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.